Granite gravel
paths connect the different areas. Top soil
replacement and extensive grading have prepared the
soil for hydromulching after electrical and
sprinkler work is finished. Trees, benches, and
lights will be added as funds are
available.
|
|
Years of planning, public
meetings, fund raising, and coordination with Texas Historic
Commission resulted in the development of a plan for
landscaping improvements. Sidewalks on three sides as well
as the sidewalk leading to the North (front) door were
installed in 2003. Work on the second phase begin early in
2010. The 4th perimeter sidewalk is now in place as well as
approach walks to the east and west doors. The unsightly and
hard to use handicapped ramp built in 1998 was removed and
replaced with a gently sloped approach walk to the west
door. Please participate in the beautification of the
Courthouse Square through both your membership and
contributions.
|
Consider making a
special contribution for the landscape project -
your contribution can fund a tree, light the
sidewalks or support general landscape
needs.
|
|